Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/roboticslab/wp-includes/functions.php on line 6121
GRC 2 - RoboticsLab

GRC 2

Factory automation of pre-fab GRC pieces for construction industry

Main researcher: C. Balaguer

GRC2

Description

This project is funded by the Spanish R&D agency CDTI and construction company DRACE (72.000 Euros ? UC3M). The main objective was the complete remodeling of the Caracola factory located in Torrejon, near Madrid. The factory manufactures big size (5-6 x 2 m) GRC (Glass Reinforced Concrete) pre-fab pieces for construction industry. The simulation of the pieces, materials, machines and operators flows permit the design of new factory lay-out. The new system is based on the automatic transportation of the panels, automatic assignation of the operators to the tasks and intelligent daily planning of the pieces to be produced. The system is supervised by the central computer with graphical friendly HMI.

Previous Project

next project