GRC 2
Updated: 13 May 2015 - 11:00am by C. Balaguer
Start:2000 / End:2002
Principal investigator: Carlos Balaguer
Funder: 
DRACE S.A. (ACS group)
Factory automation of pre-fab GRC pieces for construction industry

The objective of the project was the automation of all the manufacturing process of the GRC pre-fab pieces factory: lay-out, transportation, spying, storage, etc. The daily operations are planned and supervised with result of 30% increase the productivity

This project is funded by the Spanish R&D agency CDTI and construction company DRACE (72.000 Euros ? UC3M). The main objective was the complete remodeling of the Caracola factory located in Torrejon, near Madrid. The factory manufactures big size (5-6 x 2 m) GRC (Glass Reinforced Concrete) pre-fab pieces for construction industry. The simulation of the pieces, materials, machines and operators flows permit the design of new factory lay-out. The new system is based on the automatic transportation of the panels, automatic assignation of the operators to the tasks and intelligent daily planning of the pieces to be produced. The system is supervised by the central computer with graphical friendly HMI.

Journal Publications

Conference Publications

Patents

Books

Doctoral Thesis